What does putting on a metal roof involve?

Short answer. Putting on a metal roof involves the permit, removing the old roof or confirming a roof-over is allowed, repairing the deck, installing high-temperature underlayment, setting eave trim and closures, installing panels or metal shingles to the manufacturer's pattern, and finishing with ridge, rake and wall trims, flashings and an inspection. Panels are measured and cut to length ahead of time, and the job usually takes longer than a shingle roof.

Before work starts

The installation sequence

  1. Deck repair and renailing.
  2. Underlayment, typically high-temperature synthetic with self-adhered membrane at valleys, eaves and penetrations, or full membrane on low slopes.
  3. Eave trim and, for exposed-fastener panels, closures with butyl tape.
  4. Valley flashings.
  5. Panels squared to the eave and installed across the roof, fastened or clipped per the pattern.
  6. Rake trim, ridge and hip caps with closures, plus wall and chimney flashings.
  7. Pipe boots made for metal roofs.
  8. Cleanup of metal shavings, which rust on the panels if left behind.

How long it takes

Depending on size and complexity, a metal roof on an average house often takes several days, longer than a typical one-day shingle replacement.

Quality checks

See metal roofing in Georgia and roofing permits in Georgia.

In depth

Should you replace your roof before installing solar panels?Solar panels outlast many Georgia shingle roofs. How to weigh roof age against panel life, reinstall costs, waCan you put new shingles over old ones in Georgia?Georgia's code allows one shingle layover in limited cases, never over two layers. Learn the rules, manufacturWhat happens on roof replacement day?What really happens when a Georgia roof is replaced: prep, tear-off, deck repairs, flashing, nailing, crew saf