How do you do drip edge corners?

Short answer. At an outside corner, install the eave piece first and let it run slightly past the corner, then cut and fold the rake piece so its face wraps over the eave piece and laps it. The rake always laps over the eave, following the direction water flows, so nothing can run behind the metal.

Outside corner, eave to rake

  1. Eave piece: run it about an inch past the rake fascia. Snip the face at the corner line and fold that small tab around the end of the fascia, or trim it flush if the rake piece will cover it fully.
  2. Underlayment: it goes over the eave drip edge and under the rake drip edge, so lay it before the rake piece.
  3. Rake piece: cut the bottom end at the angle of the roof pitch. Snip the face so a tab extends below the deck line, then bend that tab down over the eave drip edge face.
  4. Fasten: nail the roof flange no more than 12 inches apart, keeping nails high enough to be covered by shingles.

Other corners

Common mistakes

Good tin snips and a hand seamer make clean bends. See drip edge explained and roof flashing explained.

In depth

Is a metal roof a good idea for a Georgia home?Standing seam vs exposed fastener metal roofs in Georgia: hail dents, the noise myth, heat and color, upkeep, Architectural or 3-tab shingles: which is right for a Georgia home?Architectural vs 3-tab shingles in Georgia: weight, wind warranties, lifespan, availability as 3-tab lines shrSynthetic underlayment or felt paper: which should go under your shingles?Synthetic underlayment vs asphalt felt under Georgia shingles: performance, what the 2024 IRC requires, and th