What is a realistic time estimate for a roof replacement?

Short answer. The work itself usually takes one day on an average North Georgia home, two or three days on large, steep or complex roofs, and longer when decking or framing repairs turn up. The whole process from first inspection to finished roof takes longer, often a few weeks, because of insurance approval, material ordering, permits, HOA approval and weather.

On-site time by roof type

The full process

  1. Inspection and measurements.
  2. Insurance claim and adjuster meeting, if storm damage is involved.
  3. Contract, shingle and color choice.
  4. HOA approval where required.
  5. Permit, depending on your city or county.
  6. Material delivery, usually a day or so before the crew arrives.
  7. Installation and cleanup.
  8. Final inspection and paperwork.

What slows it down

What speeds it up

Choosing your shingle color early, submitting HOA paperwork right away, being reachable on install day, and clearing cars and patio items from around the house. See what to expect on roof replacement day, roofing permits in Georgia and HOA roof approval in Georgia.

In depth

Should you replace your roof before installing solar panels?Solar panels outlast many Georgia shingle roofs. How to weigh roof age against panel life, reinstall costs, waCan you put new shingles over old ones in Georgia?Georgia's code allows one shingle layover in limited cases, never over two layers. Learn the rules, manufacturWhat happens on roof replacement day?What really happens when a Georgia roof is replaced: prep, tear-off, deck repairs, flashing, nailing, crew saf